April 17th: Created a
blog and started research about the trebuchet’s history.
May 8th: Researched
Trebuchet designs and found a simple design, but had to scale down
the measurements by 2/3rds to fit the size requirements.
May 9th: Cut the required
pieces and drilled the holes, assembled the trebuchet frame.
May 10th: Attached the sling
and the weights, experimented with amount of weight and the angle of
the nail to release the sling.
May 11th:
Changed the arm into a longer piece of wood to maximize the throwing
distance, and attached the trigger mechanism.
May 12th: Worked on the
steps for building the trebuchet with pictures.
May 15th: Completed the
Process of Design and Construction started the previous meeting and
started working on the physics concepts behind the trebuchet.
May 17th: Finished
describing the physics behind the on the Trebuchet.
May 18th: Tested the
trebuchet again. Painted the trebuchet.
May 19th: Edited videos,
finished the steps and materials list. Posted the materials list, the
trebuchet building steps, and the 3 trial run videos with the flow
chart. Cited sources for the Trebuchet History. Posted the Trebuchet History.
May 20th: Practiced
releasing the trebuchet in preparation for Friday.