Thursday, May 22, 2014

Log of Meeting Dates

April 17th: Created a blog and started research about the trebuchet’s history.
May 8th: Researched Trebuchet designs and found a simple design, but had to scale down the measurements by 2/3rds to fit the size requirements.
May 9th: Cut the required pieces and drilled the holes, assembled the trebuchet frame.
May 10th: Attached the sling and the weights, experimented with amount of weight and the angle of the nail to release the sling.
May 11th: Changed the arm into a longer piece of wood to maximize the throwing distance, and attached the trigger mechanism.
May 12th: Worked on the steps for building the trebuchet with pictures.
May 15th: Completed the Process of Design and Construction started the previous meeting and started working on the physics concepts behind the trebuchet.
May 17th: Finished describing the physics behind the on the Trebuchet.
May 18th: Tested the trebuchet again. Painted the trebuchet.
May 19th: Edited videos, finished the steps and materials list. Posted the materials list, the trebuchet building steps, and the 3 trial run videos with the flow chart. Cited sources for the Trebuchet History. Posted the Trebuchet History.

May 20th: Practiced releasing the trebuchet in preparation for Friday.

No comments:

Post a Comment